Lagos & Warri+234 802 627 2628
KIS Limited
KIS Limited
EPCIC · OIL & GAS · EST. 2012
Project Portfolio

Work delivered for the operators who set the standard.

Chevron, SPDC, NPDC, Elcrest and Sterling Global have all put KIS crews on their assets. Below is a selection of the work — with room reserved for the photographs, dates and tonnage figures that make each one concrete.

0
flagship projects documented
0km
bulk line welded, Sibiri–Opuama
0
major operators served
0+
years of delivery record
Lifting frame hoisted by mobile crane at the fabrication yard
CHEVRONFabrication · Structural

EPWD Lifting Frame & Structural Fabrication

Fabrication of lifting frames and structural support components for Chevron's Escravos operations — built to drawing, tested, coated and handed over with the full quality file.

CLIENT
Chevron Nigeria Limited
SCOPE
Lifting frames, structural supports
LOCATION
Reserved — site / workshop
YEAR
Reserved — delivery year
PSL / SPDCFabrication · Coatings · Load-out

SPM Buoy Fabrication & Load-out

Fabrication, protective coating and load-out of a single point mooring buoy — a job where weld integrity and coating performance decide how long the asset survives offshore.

CLIENT
PSL for SPDC
SCOPE
SPM buoy fabrication & load-out
LOCATION
Reserved — yard / quayside
YEAR
Reserved — delivery year
SPM buoy section afloat during load-out
Welder joining a section of the bulk pipeline
NPDC / ELCRESTPipeline · Welding · NDT

Sibiri–Opuama 7km Bulk Line Welding

Alignment, welding and inspection across a 7km bulk line — line-up, root and fill passes, radiographic examination and coating of the field joints, section by section.

CLIENT
NPDC / Elcrest Exploration
SCOPE
7km pipeline alignment & welding
LOCATION
Sibiri–Opuama, Delta State
YEAR
Reserved — delivery year
STERLING GLOBALFabrication · Installation

Facility Fabrication & Installation

Structural fabrication and on-site installation works for Sterling Global facilities — workshop-built assemblies delivered, erected and commissioned in place.

CLIENT
Sterling Global Oil Resources
SCOPE
Fabrication & installation
LOCATION
Reserved — facility location
YEAR
Reserved — delivery year
Fabricated steel components staged for installation
From the workshops

Capability gallery

Day-to-day work in Apapa and Ekpan — the images that show a client what our floor actually looks like.

Structural steel assembly in the workshop
Pipe spool fit-up and weld marking
Pipe fabrication — bends and elbows
Coated pipeline ready for lay
Welder at work in the workshop
Crew and site team on the workshop floor

Your project could be the next one listed here.

Send us your scope and we'll come back with a realistic timeline and a quote you can hold us to.